Lists are named after the tasks. List items are setup to display the “variety”, “location”, and “product ID” and "ready date".
The task names are concatenated with location and separated by a dash. The corresponding list is then attached to the task.
ABC Quick Select is optional. ABC Quick Select can be used by the SBI system.
Other attached list are omitted from the SBI download.